Move parts and work-in-progress from process to process, right to the line side, eliminating hand-cart "linking" work.

核心功能
  • Driving under carts or racks and lifting them
  • Line-side transfer with roller or lift tops
  • Call and dispatch from production-management systems
客户价值
  • Prevents line stops caused by waiting for materials
  • Moves transport staff to machining and assembly
  • Stable just-in-time supply reduces line-side stock
导入前需确认
  • Standardizing carts and racks, and the transfer method
  • Floor steps and slopes, and clean-room requirements

精选候选

精选可在现场实际使用的机型,并附上适用理由。“PoC”表示建议先进行小范围验证的机型。

日本国内实绩

Electronics Plant · AMR
9AMRs

OMRON's Ayabe plant automates moving finished goods and mask magazines with AMRs

Challenge

Finished goods go to shipping and mask magazines to the SMT line, both moved between processes.

Deployment

Nine AMRs plant-wide: three for shipping and one for mask magazines. Linked to MES, the nearest free AMR is dispatched.

Outcome

MES and AMRs handle dispatching from request to pickup automatically.

IndustryElectronics
UseInter-process transport
StageFull deployment

Sources: MONOist(2023-08)

Robot: OMRON AMRs (not listed on Hope-Robot mall)

Semiconductor Fab · AMR + cobot
60→42days lead time

ROHM's Hamamatsu fab automates wafer-box transport with AMRs and cobots

Challenge

Boxes of 25 wafers were carried by cart between buildings and to upper floors.

Deployment

AMRs and three cobots automate the handoff through inter-building pass boxes and upper-floor sliders (front end).

Outcome

Lead time cut from 60 to 42 days.

IndustrySemiconductors
UseWafer transport
StageFull deployment

Sources: ニュースイッチ(2026-07)

Robot: Adept (now OMRON) AMRs and three cobots (not listed on Hope-Robot mall)

海外案例

Bakery · Yaskawa
1,000trays/hour per freezer
Food Manufacturing德国

German bakery Görtz robotizes unloading frozen trays and stacking them onto racks

Challenge

Trays loaded with dough must be unloaded from the freezer and stacked onto rack trolleys.

Deployment

Four GP180 FGG robots with layer grippers unload up to six trays at a time onto racks; running since November 2024.

Outcome

Handles 1,000 trays an hour per freezer.

IndustryFood (bakery)
UseTray unloading / Racking
StageFull deployment

The deployed robots are the food-grade-grease GP180 FGG; the listing is the standard MOTOMAN-GP180.

Sources: Industrial Production Worldwide

View product details →

各行业的具体替代作业

对应各行业工序流程中的哪道工序、哪项作业。点击行业名称查看完整流程,点击 ▼ 展开作业列表。

Food Manufacturing:Industrial Bakery Production Line

替代作业 2 项

Automotive & Transport Equipment:Vehicle Production Line at an Assembly Plant

替代作业 2 项

Electronics & Semiconductors:SMT Board Assembly to Final Product Line

替代作业 4 项

咨询哪款机型更合适

我们将根据现场条件,协助筛选候选机型并规划 PoC。

导入咨询 →