首页  /  应用案例  /  日本导入实绩
日本导入实绩

在日本现场,已见成效。

汇总餐饮、物流、制造、酒店、护理等日本现场的导入与验证案例,附数据与公开出处。

Restaurants · BellaBot
Approx. 3,000units

Skylark group rolls out serving robots to about 2,100 restaurants

Challenge

Balance customer satisfaction and working conditions amid peak-time serving loads and labor shortages.

Deployment

About 3,000 units deployed to about 2,100 stores, including Gusto, Shabu-Yo, and Bamiyan, by December 2022.

Outcome

At Gusto: lunch-peak turnover +7.5%, staff steps −42%, clearing time −35%.

IndustryRestaurants
UseServing / Bussing
StageFull deployment

Sources: すかいらーくHD 2021年度通期決算説明資料(2022-02) / すかいらーくHD 統合報告書2022

View product details →
Cartken Hauler robots
Intralogistics · Cartken Hauler
Approx. 100units

Mitsubishi Electric group orders about 100 Cartken Haulers for industrial sites

Challenge

Industrial sites facing labor shortages needed to reduce manual inter-building transport.

Deployment

Melco Mobility Solutions, a Mitsubishi Electric group company, ordered about 100 units for deployment at industrial sites in Japan.

Outcome

Aims to automate inter-building transport with a 300 kg, all-weather, slope-capable robot.

IndustryManufacturing / Logistics
UseIntralogistics
StageOrdered / rolling out

Sources: Cartken プレスリリース(2025-06)

View product details →
Facility Inspection · Spot
Approx. 650hours / year

Kirin Brewery's Hokkaido Chitose plant automates inspection rounds with a quadruped

Challenge

A shrinking workforce and retiring veteran technicians left too few people for inspection rounds.

Deployment

Since August 2025, Spot patrols 5 routes and about 100 points, reading gauges and using thermal imaging.

Outcome

Expected to save about 650 inspection hours per year.

IndustryFood & Beverage
UseInspection rounds
StageFull deployment

Sources: PR TIMES(東北エンタープライズ, 2026-09)

View product details →
FlexSwift-series AMR at STOCKCREW Chiba Dock2
E-commerce Logistics · Syrius FlexSwift
60 → 20pickers / day

STOCKCREW cuts picker walking by over 65% with pick-assist AMRs

Challenge

High-SKU, small-lot e-commerce shipping meant long walking distances and staff shortages.

Deployment

Up to 110 + 15 FlexSwift-series units at two Chiba sites (as of June 2025).

Outcome

Daily steps about 20,000 → 6,500, pickers 60 → 20, order lines per hour up 50%.

IndustryE-commerce logistics
UsePick assistance
StageFull deployment

Deployed: the previous-generation FlexSwift (discontinued). The listed product is its successor, FlexSwift MAX.

Sources: PR TIMES(シリウスジャパン, 2025-06)

View product details →
Retail E-commerce · Geek+ P800R
216units

Alpen quadruples outbound capacity with shelf-carrying robots

Challenge

Walking a large warehouse to find items was holding productivity down.

Deployment

Since 2018, 216 robots at East Japan FC (Chiba) bring whole shelves to workstations.

Outcome

Outbound capacity 4x, storage 2x, and 40% less labor across the warehouse.

IndustryRetail / E-commerce
UseGoods-to-person
StageFull deployment

Sources: @Press(ギークプラス, 2024-02) / Geek+ 導入事例(ALPEN)

View product details →
Model demonstration
Care Home · PUDU CC1
90hours / month

Charm Care frees staff time with a cleaning robot

Challenge

Staff spent about 3 hours a day mopping floors.

Deployment

An 18-day trial on two floors of a nursing home.

Outcome

Estimated 90 staff-hours a month freed and cleaning costs cut 67% (¥103,000/month).

IndustryElderly care
UseFloor cleaning
StageTrial

Figures are estimates from a trial deployment.

Sources: チャーム・ケア・コーポレーション プレスリリース(2024-12)

View product details →
Hotel · KEENON W3
Up to 4rooms / trip

Hotel Sunroute Plaza Shinjuku automates late-night room service delivery

Challenge

Chronic staff shortages, with room-service requests clustering after 10 PM.

Deployment

From April 2025, the robot rides the elevators to deliver across floors and announces arrival through the in-house phone system (PBX).

Outcome

Carries orders for up to 4 rooms per trip, saving labor on late-night room service.

IndustryHotel
UseRoom delivery
StageFull deployment

Sources: PR TIMES(相鉄ホテルマネジメント・DFA Robotics, 2025-04) / DFA Robotics 導入事例

View product details →
Airport · Humanoids
HanedaAirport

JAL Ground Service and GMO AIR trial humanoids at Haneda Airport

Challenge

Evaluate whether humanoids can support airport ground handling amid labor shortages.

Deployment

A trial started at Haneda Airport in May 2026 and is planned to run through 2028.

Outcome

Step-by-step validation for ground handling such as loading and unloading baggage and cargo.

IndustryAirport
UseGround handling
StagePoC

The models used (including Unitree G1) are based on press-conference reporting.

Sources: PR TIMES(日本航空 共同リリース, 2026-04) / GMOインターネットグループ ニュース(2026-04) / Impress Watch(使用機種の報道)

View product details →
Hospital · KEENON W3
330+hours / year

Jikei University Kashiwa Hospital saves 330+ hours a year on specimen and drug transport

Challenge

With 664 beds, 1,300+ outpatients a day and no pneumatic tube system, staff spent about 1–3 hours a day carrying specimens and drugs.

Deployment

In full use since June 2025 on three routes: ER/wards and internal-medicine outpatients to the central lab, and pharmacy to the outpatient chemotherapy room.

Outcome

Over 330 staff-hours saved per year; about 90% of staff said they gained time for their core work.

IndustryHospital
UseIn-hospital transport (specimens / drugs)
StageFull deployment

Sources: PR TIMES(DFA Robotics, 2026-08) / DFA Robotics プレスリリース(慈恵医大サイト掲載PDF, 2026-08)

View product details →
Spot walking beside the tracks with Tokyu inspectors
Railway · Spot
Rail-industry firststanding deployment in Japan

Tokyu Railways brings a quadruped into substation and depot inspections

Challenge

Make inspections of electrical equipment and on-board train equipment, now done by inspectors, more advanced and efficient.

Deployment

From April 2025 at the substation and depot near Motosumiyoshi Station, testing meter reading, thermal visual checks and ultrasonic gas-leak location.

Outcome

Runs field and office work in parallel; aims for AI-based automatic entry into inspection sheets and optimized inspection intervals.

IndustryRailway
UseSubstation / rolling-stock inspection
StagePoC

Sources: 東急電鉄 ニュースリリース(2025-02)

View product details →
Construction · Spot
Up to 30%less filming time

Takenaka uses a quadruped to film as-built survey footage at a station-building site

Challenge

Filming for as-built drawings of repeatedly renovated facilities suffered blur and gaps on unstable ground, forcing reshoots.

Deployment

At the JR Shin-Koiwa Station south-exit building project (Tekken–Takenaka JV), a camera-equipped Spot patrolled a set route to film footage turned into point clouds.

Outcome

Filming time cut by up to about 30%; point clouds overlaid on BIM to check clashes with existing structures in advance.

IndustryConstruction
UseSite patrol / surveying
StagePoC

Sources: 竹中工務店 ニュースリリース(2023-07)

View product details →
Spot collecting equipment data beside piping at the Sakai refinery
Oil Refining · Spot
SakaiRefinery

Cosmo Oil tests quadruped equipment inspection at its Sakai refinery

Challenge

Many units have run for 50+ years, so maintenance must get better at preventing age-related failures.

Deployment

On May 24–28, 2026, with Tohoku Enterprise, one Spot patrolled the wastewater-treatment area autonomously, including at night, collecting equipment data.

Outcome

Autonomy stability, data accuracy and anomaly detection are being evaluated toward a phased rollout decision.

IndustryOil refining
UseEquipment inspection
StagePoC

Sources: PR TIMES(コスモ石油, 2026-07) / コスモ石油 プレスリリース(2026-07)

View product details →
Geek+ MP1000R moving robot
Automotive · Geek+ AMR
400+units

Over 400 Geek+ transport AMRs run across Toyota plants

Challenge

Labor shortages and new truck-driver work-hour rules made automating in-plant logistics urgent.

Deployment

Over 400 units run across several plants, with up to about 200 robots per system.

Outcome

Unmanned transport from receiving through picking to machining areas, with less risk of crossing forklifts and tow tractors.

IndustryAutomotive
UseInter-process transport
StageFull deployment

Deployed: MP1000R from Geek+'s M series (not listed). The listed product is the M3000C from the same series.

Sources: PR TIMES(ギークプラス, 2026-06)

View product details →
Consumer Goods · VisionNav VNP15
Fully automatedpallet transfer

S.T. Corporation's Fukushima plant fully automates finished-goods transfer with an autonomous forklift

Challenge

Palletizing was already automated, but moving pallets to the next step still needed workers.

Deployment

Triggered by equipment PLC signals, the VNP15 carries finished pallets to the truck berth and refills the palletizer with empty pallets.

Outcome

Destinations are assigned automatically, so the whole transfer runs with no operator instructions.

IndustryConsumer goods manufacturing
UseFinished-pallet transfer
StageFull deployment

Sources: VisionNav Japan 導入事例(エステー, 2024-10)

View product details →
Wheeled quadruped robot on a Tokyo Station platform
Station Facilities · Unitree Go2-W
TokyoStation

JR East Facility Management trials quadruped inspections at Tokyo Station

Challenge

Keep station maintenance sustainable amid labor shortages and even out variation in human inspection results.

Deployment

From September 10, 2025 at Tokyo Station, a Unitree Go2-W fitted with TechShare's autonomy unit, cameras and 3D LiDAR patrols set routes.

Outcome

Records the state of passages and equipment on autonomous routes; rollout to other Tokyo-area stations is under consideration.

IndustryFacility management (stations)
UseInspection rounds
StagePoC

Sources: PR TIMES(JR東日本ビルテック, 2025-11)

View product details →
Cleaning robot in a supermarket aisle
Supermarket · Phantas
120stores

York Benimaru and its cleaning contractors roll out cleaning robots to 120 stores

Challenge

Hiring difficulties, an aging cleaning staff and rising minimum wages were eroding the economics of store cleaning.

Deployment

Contractors sign for and run the robots: Whiz i on ceramic floors, wet-mopping Phantas on plastic-tile floors, now across 120 stores.

Outcome

Cleanliness maintained at lower cost, contractor margins improved, and families with children respond well.

IndustrySupermarket
UseFloor cleaning
StageFull deployment

Deployed: Iris Ohyama's Phantas edition. The 120 stores cover all cleaning robots, including Whiz i (as of FY2024).

Sources: アイリスオーヤマ 導入事例(ヨークベニマル・東北装美)

View product details →
Education · LOVOT
25xbreak-room use

Yokohama Shuyukan High School puts LOVOT in its break room; usage rises 25x

Challenge

A public correspondence high school with students of varied ages and backgrounds wanted a place where students feel at ease.

Deployment

LOVOT was placed in the student break room, where students hold it between classes and it stays nearby during teacher meetings.

Outcome

Break-room use rose 25-fold; infrequent attendees came in to see it, and a selectively mute student greeted a teacher while holding it.

IndustryEducation
UseStudent well-being
StageFull deployment

Sources: PR TIMES(GROOVE X, 2026-08)

View product details →
Automotive · VisionNav VNP15
Fully unmannedchute feeding

Mazda's head plant makes part feeding fully unmanned with an autonomous forklift and camera monitoring

Challenge

Manual forklift replenishment shifted parts across several lanes, so location records needed operator input.

Deployment

At the head plant, the VNP15 takes parts from double-stacked steel pallets (4 deep × 12 wide) and feeds a chute, triggered by equipment PLC signals via RCS.

Outcome

14 cameras detect part movements in real time and update locations automatically, enabling fully unmanned operation.

IndustryAutomotive
UseInter-process transport / part feeding
StageFull deployment

Sources: VisionNav Japan 導入事例(マツダ, 2025-05)

View product details →
Yarbo snow-clearing robot throwing snow
Municipality · Snow-clearing Robot
SapporoCity

Sapporo City and DFA Robotics run trials of an autonomous snow-clearing robot

Challenge

Winter snow clearing and removal face a looming worker shortage and rising costs.

Deployment

Under a December 2025 partnership, the Yarbo autonomous snow robot was tested at Sapporo City Hall from January 28 to February 6, 2026.

Outcome

Validates safe autonomy on snow and ice, obstacle avoidance, route design and battery use toward real-world rollout.

IndustryMunicipality
UseSnow clearing
StagePoC

Sources: PR TIMES(DFA Robotics, 2026-01)

View product details →
HaiPick Climb robot climbing a rack with a tote
Manufacturer Logistics · HaiPick Climb
270,000SKUs (max)

KOKUYO adopts a climbing-robot storage system for its new Tohoku IDC hub

Challenge

Shorten delivery lead times and broaden the assortment for the Tohoku and Hokkaido regions.

Deployment

HaiPick Climb System is the core equipment at the new Tohoku IDC, which consolidates Kaunet's logistics, controlled together with other equipment by Hitachi's WCS.

Outcome

Plans storage of up to 270,000 SKUs, about 40% higher productivity than the average of three main sites, and 50–70% less stocktaking work.

IndustryManufacturer logistics
UseGoods-to-person / high-density storage
StageOrdered / rolling out

Sources: PR TIMES(HAI ROBOTICS JAPAN, 2026-05)

View product details →
Auto Plant · Powertrain marriage
6→1stations

Nissan's Tochigi plant fully automates powertrain marriage and upward bolt tightening with robots

Challenge

Fitting the motor, battery, and rear suspension and tightening bolts upward from under the body took six stations.

Deployment

Workers set the units on a pallet; high-speed vision tracks the body in real time while robots marry the units and tighten bolts upward.

Outcome

Six stations consolidated into one, handling gasoline, e-POWER, and EV models on the same line.

IndustryAutomotive
UsePowertrain marriage / Fastening
StageFull deployment

Sources: 日産 工場見学 STORIES 04

Robot: Nissan Tochigi SUMO (in-house marriage line) (not listed on Hope-Robot mall)

Auto Plant · Paint inspection
0.3mm dirt detected

Nissan's Tochigi plant automates paint-surface inspection and color and film-thickness measurement with robots

Challenge

Painted bodies and bumpers must be checked for dirt, nibs, and craters, plus color, film thickness, and gloss.

Deployment

On the Ariya line, several robots with zebra lighting and cameras inspect the body in about 600 zones; contact-probe robots measure color, thickness, and gloss.

Outcome

Detects dirt down to 0.3 mm; defects are sent to inspectors' phones for checking and repair.

IndustryAutomotive
UsePaint inspection
StageFull deployment

Sources: 日産 工場見学 STORIES 05

Robot: Camera and contact-probe inspection robots (Nissan Tochigi) (not listed on Hope-Robot mall)

Auto Plant · Assembly robots
3tasks robotized

Honda's Yorii plant robotizes instrument-panel installation, electrical-unit fitting, and grommet plugging

Challenge

Trim and final assembly involves many parts and relies mostly on manual work.

Deployment

Instrument-panel robots since launch; in 2015 the power-drive unit fitting and grommet plugging were robotized too.

Outcome

Robots now handle three tasks in the trim process.

IndustryAutomotive
UseTrim assembly
StageFull deployment

Sources: ニュースイッチ(2016-03)

Robot: Assembly robots (Honda Yorii plant) (not listed on Hope-Robot mall)

Finished-car Yard · VLR
8km/day of walking replaced

Toyota's Motomachi plant automates moving finished cars in the yard with the VLR transport robot

Challenge

Drivers moving finished cars to the yard walked about 8 km a day back to the line.

Deployment

Slides under the car, lifts all four wheels, and drives autonomously with centimeter-level RTK-GNSS, adjusting to wheelbase and ride height; fleet-managed since September 2023.

Outcome

Replaces driver moves and the walk back with robotic transport.

IndustryAutomotive
UseFinished-car transport
StageFull deployment

Sources: 自動運転ラボ(2023-09) / MONOist(2023-09)

Robot: VLR vehicle transport robot (Toyota) (not listed on Hope-Robot mall)

Finished-car Transport · Driverless tow
1.4km towed driverless

Nissan's Oppama plant tows finished cars to its wharf with an autonomous tow vehicle

Challenge

Finished cars must be moved about 1.4 km from the plant to the company's wharf.

Deployment

A LEAF-based autonomous tow vehicle that reads lane lines and curbs with cameras and laser scanners and tows up to three cars; introduced in December 2016 after 1,600+ test runs.

Outcome

Plant-to-wharf transport of finished cars runs without a driver.

IndustryAutomotive
UseFinished-car transport
StageFull deployment

Sources: 日産 ニュースリリース(2016-12) / LOGISTICS TODAY(2016-12)

Robot: Intelligent Vehicle Towing (Nissan, LEAF-based) (not listed on Hope-Robot mall)

Parts Plant · Depalletizing
3→0staff

Matsuda Electric automates unloading mixed returnable containers with Mujin robots

Challenge

Returnable containers of different shapes and stacking patterns arrive mixed, and three people unloaded them.

Deployment

Two depalletizing robots running MujinOS with 3D vision (announced September 2026).

Outcome

From three staff to none, handling about 5,000 boxes a day.

IndustryAutomotive parts
UseReceiving / Depalletizing
StageFull deployment

Sources: LOGISTICS TODAY(2026-09)

Robot: Mujin depalletizing robots (MujinOS, 3D vision) (not listed on Hope-Robot mall)

Bakery · Cobot
5→2staff

Takaki Bakery's Tsukuba plant automates shipping labels on bread crates with robots

Challenge

About 23,000 items a day across 56 SKUs ship in bread crates, each needing a shipping label.

Deployment

A MOTOMAN-HC10 cobot senses four crate types to supply, discharge, and stack them; a MOTOMAN-MPP3S delta robot applies 3,000 labels an hour. Part of a METI demonstration program (FY2017).

Outcome

Staff 5 → 2, productivity 2.5×, payback 1.8 years.

IndustryFood (bakery)
UseLabeling / Crate handling
StageFull deployment

The deployed cobot is the original MOTOMAN-HC10 (labels by a MOTOMAN-MPP3S); the listing is the current MOTOMAN-HC10DTP.

Sources: 経済産業省 ロボット導入実証事業 事例集(2018)

View product details →
Beverage Plant · Ingredient feeding
2,391hours/year saved

Kirin Beverage fully automates tea-leaf unpacking and feeding with three robots

Challenge

People unpacked tea leaves (up to 25 kg) from cartons, fed them in, and weighed them.

Deployment

Three robots and peripherals fully automate opening cartons, lifting out inner bags, cutting, feeding, and clearing empties.

Outcome

Saves 1,870 hours a year in feeding and 521 hours in weighing.

IndustryBeverages
UseIngredient feeding
StageFull deployment

Sources: 日本SDA 第31回大会 資料

Robot: Three FANUC robots (not listed on Hope-Robot mall)

Electronics Plant · Dual-arm robot
2019deployed

Panasonic's Kobe plant automates high-mix board testing with a dual-arm robot

Challenge

High-mix boards must be loaded into testers and fixtures, judged pass or fail, and sorted.

Deployment

A dual-arm robot loads boards into the existing testers and fixtures, judges them by image recognition, and sorts them (2019).

Outcome

Needs no wiring, so it can be moved to suit the product mix.

IndustryElectronics
UseBoard testing
StageFull deployment

Sources: MONOist(2019-07)

Robot: Dual-arm robot (Panasonic Kobe plant) (not listed on Hope-Robot mall)

Electronics Plant · UR3
31% productivity gain

Koyo Electronics automates touch-panel testing of panel computers with a UR3 cobot

Challenge

Touch panels on panel computers are tested by pressing with a stylus and checking the response.

Deployment

A UR3 cobot presses the panel with a stylus and checks the response; three months from introduction to operation.

Outcome

Productivity +31%, post-test staff 2 → 1, payback about one year.

IndustryElectronics
UseFunctional test
StageFull deployment

The deployed unit is the previous-generation UR3 (CB-Series); the listing is its successor, the UR3e.

Sources: Universal Robots 導入事例

View product details →
Electronics Plant · AMR
9AMRs

OMRON's Ayabe plant automates moving finished goods and mask magazines with AMRs

Challenge

Finished goods go to shipping and mask magazines to the SMT line, both moved between processes.

Deployment

Nine AMRs plant-wide: three for shipping and one for mask magazines. Linked to MES, the nearest free AMR is dispatched.

Outcome

MES and AMRs handle dispatching from request to pickup automatically.

IndustryElectronics
UseInter-process transport
StageFull deployment

Sources: MONOist(2023-08)

Robot: OMRON AMRs (not listed on Hope-Robot mall)

Semiconductor Fab · AMR + cobot
60→42days lead time

ROHM's Hamamatsu fab automates wafer-box transport with AMRs and cobots

Challenge

Boxes of 25 wafers were carried by cart between buildings and to upper floors.

Deployment

AMRs and three cobots automate the handoff through inter-building pass boxes and upper-floor sliders (front end).

Outcome

Lead time cut from 60 to 42 days.

IndustrySemiconductors
UseWafer transport
StageFull deployment

Sources: ニュースイッチ(2026-07)

Robot: Adept (now OMRON) AMRs and three cobots (not listed on Hope-Robot mall)

※数据与实绩均基于各公司的公开信息。导入机型与本站在售产品不同时,已在卡片中注明。

咨询类似的导入方案

我们将根据业务内容与运行环境,协助筛选候选机型并规划 PoC。

导入咨询 →